Solve this problem – A bank is contemplating whether to use 5 tellers and 1 line (Process Logic A) or 5 separate lines, one line for each teller (Process Logic B) Customers arrive into the bank at the interarrival time that is exponentially distributed and a mean of 1 minute. (EXPO-1) 2a. Case 1: when… Continue reading Solve this problem –
A bank is contemplating whether to use 5 tellers and 1 lin
Category: Mechanical Engineering
we are doing a project about building and designing an RC plan from foam. the wi
we are doing a project about building and designing an RC plan from foam. the wing is MH 112 airfoil with dimentions of (chord is10.5 in and span is 60 in and hight 1.2 in) in top of the plane and two battery wight 200g inside the wings the fuselage is contain a four pice… Continue reading we are doing a project about building and designing an RC plan from foam.
the wi
A liquid hydrogen (LH2) tank is a double-hulled tank composed of cold drawn and annealed 316 stainless steel, with the cryogenic liquid on the inside and vacuum in the annular space (the outer tank)
A liquid hydrogen (LH2) tank is a double-hulled tank composed of cold drawn and annealed 316 stainless steel, with the cryogenic liquid on the inside and vacuum in the annular space (the outer tank).