Read Carefully!!!! You are required to prepare a construction estimate and schedule for the work indicated on the attached plans. DELIVERABLES 1. Title Sheet 2. Table of Contents 3. A brief written narrative summarizing your approach for both the estimate and schedule. Your summary should state a summary of the estimate and a summary of… Continue reading Read Carefully!!!!
You are required to prepare a construction estimate and sched
Category: Civil Engineering
Read Carefully!!!! You are required to prepare a construction estimate and sched
Read Carefully!!!! You are required to prepare a construction estimate and schedule for the work indicated on the attached plans. DELIVERABLES 1. Title Sheet 2. Table of Contents 3. A brief written narrative summarizing your approach for both the estimate and schedule. Your summary should state a summary of the estimate and a summary of… Continue reading Read Carefully!!!!
You are required to prepare a construction estimate and sched
everything is provided in the lab manual attached. i will attach the data as we
everything is provided in the lab manual attached. i will attach the data as well.To be clear, this file has the data for both tests run yesterday at two different confining pressures. Both of these tests should be included in the results section meaning you should have two Mohr’s circles allowing you to plot a… Continue reading everything is provided in the lab manual attached. i will attach the data as we
1. Provide a brief (2-3 sentence) written description of the watershed you chose
1. Provide a brief (2-3 sentence) written description of the watershed you chose to delineate. Chose a location in the US) 2. Provide a brief (2-3 sentence) written description of the DEM dataset you used and (Hillshaded) DEM. Which elevation data did you use, where did you get it, what was the resolution, did you… Continue reading 1. Provide a brief (2-3 sentence) written description of the watershed you chose
1. Provide a brief (2-3 sentence) written description of the watershed you chose
1. Provide a brief (2-3 sentence) written description of the watershed you chose to delineate. Chose a location in the US) 2. Provide a brief (2-3 sentence) written description of the DEM dataset you used and (Hillshaded) DEM. Which elevation data did you use, where did you get it, what was the resolution, did you… Continue reading 1. Provide a brief (2-3 sentence) written description of the watershed you chose
Describe how the duration of obtaining Wetland Mitigation Permits can impact the overall project schedule
Prompt: As discussed during this week’s lecture the duration that is required to obtain regulatory permits and once a permit is obtained the timing restrictions can have significant affect on a project schedule. List at least four measures that an owner can use to identify and mitigate issues, so the project can meet the overall… Continue reading Describe how the duration of obtaining Wetland Mitigation Permits can impact the overall project schedule
Lab report about Hardness Procedure
I need lab report about (Hardness Procedure) only and I give you the data i need only one page about Hardness Procedure
What is the part of the delay the General Contractor is responsible for?
Prompt: You are faced with a significant claim related to the discovery of a previously unknown underground storage tank (it was not shown on the drawings and was not included in the scope of work) that has created has caused the project to stop. In order to remove the tank, the General Contractor was directed… Continue reading What is the part of the delay the General Contractor is responsible for?